top of page

Leadership

A MESSAGE FROM OUR FOUNDER

"Cities have always fascinated me. As a kid, I spent hours building buildings, roads, bridges, and intersections out of LEGO, imagining how people would move through the little worlds I created. My father, also a traffic engineer, with a local traffic data collection firm, gave me my first real glimpse into how those systems worked in real life. By the time I was a teenager, I was already out in the field, collecting traffic counts and learning the building blocks of the profession that would become my career.

​

That early passion led me to McMaster University, I studied civil engineering and began working in transportation right away. Early in my career at a large multidisciplinary firm, I gained invaluable experience preparing traffic studies, staging plans, and municipal designs on exciting projects such as the The Rt. Hon. Herb Gray Parkway and Eglinton Crosstown Twin-Tunnel Project. A chapter living in Amsterdam reshaped my perspective, where I saw firsthand how thoughtful planning and active transportation can make a city thrive. Later, working in Vancouver and Toronto on major transit projects like the Surrey-Langley SkyTrain extension and Scarborough Subway Extension, I learned how to manage the complex, high-stakes challenges that come with building city-shaping infrastructure.

​

With MDT, I’ve taken everything I’ve learned and focused it on helping developers and communities grow together. My mission is to deliver traffic and transportation solutions that not only check the boxes for compliance and approvals, but also genuinely improve how people experience a place. At MDT, we see traffic not as a roadblock, but as an opportunity to make development stronger, more connected, and more sustainable."

​

Michael Dworczak, P.Eng.
Principal

IMG_4568.jpeg

Michael Dworczak, P.Eng.
Principal

Relevant Qualifications

Throughout his career, Michael has delivered traffic solutions that balance municipal compliance, stakeholder expectations, and developer priorities. His portfolio spans site-specific impact studies for residential, commercial, and institutional projects, as well as corridor studies, environmental assessments, and large-scale infrastructure developments. In addition to technical analysis, he has supported clients with council presentations, stakeholder engagement, and public consultation, ensuring complex traffic issues are clearly communicated and successfully resolved.

​

Michael’s background also includes working on major transit projects in Toronto and Vancouver, where he led the traffic and utility scope for the Scarborough Subway Extension and Surrey-Langley SkyTrain Project. These roles strengthened his expertise in construction traffic management, multi-modal planning, and agency coordination—skills he now applies to development-driven traffic work. Today, as Principal of MDT Urban Traffic Solutions Ltd., Michael focuses on helping developers across Southern Ontario achieve faster approvals and stronger projects through clear, defensible, and cost-effective traffic solutions.

2021- 2025

Gannett Fleming

Advance Works Project Manager/Surface Civils Linear Design Conformance Manager 

2016 - 2021

Hatch Ltd.

Transportation Engineer/Project Manager

2015-2016

Paradigm Transportation Solutions Limited

Transportation Analyst/Engineer

2011-2015

Hatch Mott MacDonald

Transportation Engineer in Training

2012

McMaster University

Bachelor, Civil Engineering

Selected Project Highlights

231 Bay Street North Traffic Impact Study, Hamilton, ON

Prepared a development-focused TIA in Hamilton, providing traffic forecasting, access review, and operational analysis to support planning approvals.

​

Sioux Lookout High School Traffic Impact Assessment, Sioux Lookout, ON

Conducted a traffic impact study for a new institutional site, addressing traffic distribution, trip generation, and access requirements to satisfy municipal review.

​

Scarborough Subway Extension, Toronto, ON

Preliminary Traffic & Transit Management Plan. Authored the Pre-TTMP for City Council approval, analyzing long-term construction traffic impacts and mitigation strategies for major corridor closures.

​

Pattullo Bridge Rehabilitation, New Westminster, BC

Construction Traffic Analysis. Developed construction traffic model (Synchro/VISSIM) and detour strategies for a major bridge replacement project, de-risking contractor procurement and municipal negotiations.

​

Niagara-on-the-Lake Speed Limits Review, NTOL, ON

Completed a municipal traffic operations and safety review, analyzing collision data, sightlines, and policy criteria to recommend speed limit changes.

Get in Touch

289.768.5438

bottom of page